Feedback

Representative in local port

  1. High & Heavy and Break Bulk operation information: self-tension and ramp limitation / axle weights / safe cargo carrier handling / specific lashing planning / specialized cargo operation / heating or electric requirements.
  2. Latest version of the cargo/stowage plan, working sequence plan, dangerous goods list and updated volume for loading/discharging.
  3. Any significant last-minute changes of the pre-plan must be accepted by the vessel's command from a vessel stability point of view.
  4. Information about units with special requirements, restricted height clearance.
  5. Need for maneuvering internal ramps during cargo operation and the control of height clearance.
  6. Landing/loading of cargo handling and lashing equipment.
  7. Alternative Fuel Vehicle information (Type of AFV, make and model / stowage position onboard.)
  8. Identification of accountable persons such as Superintendent, Stevedore Supervisors, foreman.
  9. Exception list notations.
  10. Shifting of cargo during the cargo operation.
  11. Local health & safety requirements, Terminal & Stevedoring policies