- Pipes shall be unitised as instructed.
- Usually, pipes shall be placed on bolsters layer by layer, with timber of sufficient strength and dimension between each layer.
- Bundles of small pipes should be unitised as above unless otherwise instructed.
- Wedges shall, if required or so instructed, be fastened under each of the outermost pipes on top of timber laid across both ends of bolsters.
- Steel banding of sufficient strength must be used. Wire lashings with turnbuckles shall be used if required or so instructed.
- Pipes loaded on roll trailers shall always use 3 stanchions on each side regardless of height. If packed in bundles it can be reconsidered depending on way of bundling. i.e., if it can collapse or not.