Feedback

Empty bolsters

  1. Empty bolsters shall be unitised in a maximum of six bolsters high per bundle.
  2. Prior to unitising, the stevedore should remove all old lashings/steel banding.
  3. It is important that bolsters are stacked directly on top of each other, so that the corner casting rest firmly in the recess on the underneath bolster.
  4. OPERATORS rep. should always approve the handling of unitised bolsters with crane.
  5. Proper securing devices (Twist-locks, steel bands, etc.) are to be used between each bundle of empty bolsters. When loaded under deck, a minimum of 4 chain lashings should be attached from the uppermost bolster in each bundle to deck or lashed as instructed by Vessel Master or OPERATORS rep.