Feedback

Heavy lifts by crane

  1. The floating crane operator and/or shipper are usually responsible for providing the gear required for loading/discharging.
  2. Preparation for loading/discharging heavy lift to/from the weather deck shall be as instructed from Stowage Planning and Port Operations.
  3. Stevedores shall supply the required skilled foremen and laborers to handle the loading/ discharging.
  4. Heavy-Lift shall be handled exactly as instructed.
  5. All lifts should be checked for proper weight before loaded onboard.