- The floating crane operator and/or shipper are usually responsible for providing the gear required for loading/discharging.
- Preparation for loading/discharging heavy lift to/from the weather deck shall be as instructed from Stowage Planning and Port Operations.
- Stevedores shall supply the required skilled foremen and laborers to handle the loading/ discharging.
- Heavy-Lift shall be handled exactly as instructed.
- All lifts should be checked for proper weight before loaded onboard.